Design Guidelines
Macquarie University Property

Wet Lab Prep

Space description

The Wet Lab Preparation room is a supplementary support space to the Teaching Laboratory.
Fixtures, tables, workbenches and cupboards are provided for the preparation of experiments and the storage, cleaning, and preparation of materials, apparatus and equipment.

Adjacencies

The Wet Preparation room should have access to and from the adjacent Laboratory(/ies).

Utilisation

Prep rooms are noted to be busy between booked class periods with frequent travel between the prep room and adjoining lab/s during this time to set up the lab for the next session.  During class times prep rooms remain closed and off limits to students.

Prep rooms are often also heavily utilised before and after teaching hours to prepare and clean up from the day's teaching activities.

[ Expand all ]

Components

Planning

Planning

Site factors - Location of existing services to be considered.
- Shared lab services such as RO water and gas connections to be considered.
Room and Spaces Planning Requirements - Room proportion to suit layout of furniture.
- Room size to be suitable to the size of the lab spaces served.
- Access to adjacent store room/s.
Design occupancy - To suit user requirements.
- Lab technicians and lab managers should be consulted during design phase.

More information about Planning

Building fabric

Internal Walls

Impact Resistance - Standard Plasterboard Wall finish (painted Shoji White)
- Impact resistant plaster board where required.
Wall Finish

- Fabric pinboard finish from 900mm to 2100mm where requested.

Other - Splashback behind basin to 1200mm
- Splashback above benches 450mm high (except where window are located)

More information about Internal Walls

Floors

General Selection Requirements - Floor finish to be suitable for wet areas.
Preferred Material Selection

- Altroflor Industrial sheet flooring (preferred), colour: fog

- Marmoleum (Anti-Static)

Other - Flooring turned up 150mm high as coved skirting

More information about Floors

Ceilings

Ceiling Finishes - Non combustible ceiling linings are required.
Ceiling Heights - Min. 2400mm above FFL.
Ceiling Selection

- Grid ceiling preferred.

- Grid ceilings under plant equipment

Acoustic Ceilings - Gridded acoustic tile ceiling Ecophon Acoustic in white, or similar.
Non Combustible / Fire Rate- Non combustible ceiling linings are required

More information about Ceilings

Openings

Windows

Window Selection Requirements - External Windows not required for this space.
Observation Windows - Observation window to adjoining lab spaces where possible.
- Observation window height to be between 900mm and 2100mm.
Visual Privacy - Frosting as required.
Window Furniture - Blinds to external glazing - brown out capability.

More information about Windows

Doors

Doors Type - External door solid core.
- Door to adjoining lab to be min. 1.5 leaf solid core with vision panel, with min. 900mm clear opening.
- Internal half glazed doors to other adjacent areas.
Door Function - Door to adjoining lab/s to be auto opening with Cardex Swipe to outside and leaver exit handle internal (Karba/boyd locking)
- Automatic cavity slider doors may be suitable between prep spaces and teaching labs.
- Other internal doors - open push button optional.
Glazing - Glazed panels to teaching labs, 125mm wide by 600mm high with sill at 1200mm.
Door Hardware Lock type
- Electric strike lock
Keying / locking
- Cardax External swipe.
Master keying
- Master keyed - Research lab spaces
Other
-

More information about Doors

Fixtures

Fixtures

General Design Principles - Provision space for wet activities thoughout.
- Provision space for use and storage of chemicals.
Amenities for Mobility Impaired Persons - To be determined through design process and risk analysis for building/floor/lab.

More information about Fixtures

Sanitary Fixtures

Lab Fixtures - Stainless Steel Lab sinks as required.
Safety Fixtures - Caroma hand wash basin with Enware taps adjacent to entry door.

More information about Sanitary Fixtures

Furniture

Furniture

General Design Principles - Provision space for wet activities thoughout.
- Provision for use and storage of chemicals.
Recommended Furniture Selection - Storage - System 7 underbench stage (Wedgewood powdercoat)
Desk & Chair Selection - KPD lab bench- Chemform top
- Seating - to project specification if required.

More information about Furniture

Fixed Furniture

General- HWB only - Caroma + Enware tapware & Bottle trap
- Storage - System 7 underbench stage (Wedgewood Powdercoat)
- Other joinery storage items as required.
Pinboards - Fabric pinboard finish from 900mm to 2100mm if/where required by users.
AV infrastructure - Not required.

More information about Fixed Furniture

Fittings

Window Coverings

Blinds - To external windows where required - brown out capability.

More information about Window Coverings

Signage

General"EYE PROTECTION REQUIRED" plus symbol, at both ends of Laboratory.
"ENCLOSED FOOTWEAR REQUIRED" plus symbol, at both ends of Laboratory.
"EMERGENCY STOP", above emergency stop near door.
Door SignageNumber Sequential within block Ie. "PREPARATION"
Macquarie University Signage and Wayfinding -

More information about Signage

Security

Security

Security type / group - Restricted access.  Lab tech and staff only.
CCTV - Not required.
Access control - Swipe access required.
Intruder detection - Not required.
Keying - Refer to Doors

More information about Security

Acoustics

Acoustics

Noise level - Noise Level Within space should be considered
Noise emittance - Limited internal noise emittance
Room to room - Room to room acoustics should be reduced
Room acoustics - Room reverberation time to be considered

More information about Acoustics

Services

Ventilation

Natural ventilation - Natural ventilation as redundancy for mechanical - minimum 7% of floor area.
Supply air - To suit overall building system.
- Positive/negative pressure requirements to be considered during design process.
Exhaust - Provide local exhaust when soldering undertaken.
- Exhaust required for fume cupboards.
Controls - Controlled via BMS.
Other- Additional exhaust as required for specific equipment items.

More information about Ventilation

Conditioning

Mechanical cooling - Air conditioned - use swell diffusers
Mechanical heating - Provide heating to MQ standard
- Humidity and min/max temperatures to be addressed in design phase.
Controls - Localised temperature set points in room.
- Humidity set points in room where required by lab function.
- All other conditioning controls via BMS.
Other Humidity - less than 60%
minimum value - project specific

More information about Conditioning

Water

Potable cold water - Required to 1 x hand basin, sinks, safety showers, and eye wash.
Potable hot / warm water - Warm water to HWB and sinks.
Non-potable water - As required for users.
Other - RO and/or Milli-Q as required by users/faculty.
- Purified and/or Deionoised water as required by users/faculty.
- All outlets to be labelled accordingly.
- All labs where chemicals are used require a safety shower and eye wash, supplied by potable cold water.

More information about Water

Drainage

Sanitary drainage - Connection to HWB. Include bottle trap
- Connection to lab sinks throughout.
- Eye wash to drain to plumbed waste line.
- Safety shower is not to be plumbed to waste line.
Trade waste - All drainage pipework to be HDPE.
Other - No floor waste to be installed in to Wet or Damp labs.
- When dry ice is to be used sinks must be stainless steel.

More information about Drainage

Gas

General- Typically not required in prep spaces.  Project specific item.
Lab Gases Consider the following service points to workbenches and confirm requirements with Faculty and user groups:
Natural gas, Oxygen, Nitrogen, Hydrogen, Helium, Vacuum, Medium pressure compressed air, and/or High pressure compressed air.
Other - Emergency stop button required where gases are installed.
- Consider gas detection and emergency stop facilities.
- C02 monitors if required by faculty or user group.

More information about Gas

Fire protection

Fire detection - Smoke detection
Fire suppression - Fire hose reel to code.
EWIS - EWIS to prep spaces
Portable fire equipment - Portable fire extinguisher / blanket located adjacent to entry door

More information about Fire protection

Illumination

Lighting / lux levels - 240 lux.
Lighting controls - C-Bus Programable switching to all labs.
Other - Recessed/flush mounted sealed LED light fittings.
Natural LightingDaylight- Natural daylight to room is desirable.
Brownout- Brownout of room is required.
Light - Other- Anti glare blinds to external windows.

More information about Illumination

Power

Type - GPO Points to suit occupancy. Min. 10A cuicuit
- IP rated GPO's near wet areas.
- Dedicated cleaners circuit
- Dedicated circuit to fridge/freezers.
- Max 10 outlets per circuit.
- Laptop charging provisions
Quantity - To be determined through detailed design process.
Other - Include Emergency stop button to turn off power & gas, except for fridges/freezers.

More information about Power

Communication / AV

Voice - Phone required at entry doorway, 1050mm above FFL, with 150mm clearance around.
- Use MQ IT standard Avaya handset.
Data - Data points as required by users and equipment.
WAP - Wireless access point throughout.

More information about Communication / AV

Commissioning

Commissioning

Building Commissioning -
Services Commissioning -
As Built Documentation -

More information about Commissioning