Building Commissioning

On the completion of building works commissioning of the building and services is to be undertaken including the Building Management Control System (BMCS).

The BMCS will also be used for commissioning of the various building services.

Below are services checklists that are to be used in the review of the services design as well as in the commissioning of the building and services.

  • Works in Connection with services ( Link to PDF)
  • Building Services Compliance Checklist ( Link to PDF)
  • Mechanical Services Compliance Checklist ( Link to PDF)
  • Electrical Services Compliance Checklist ( Link to PDF)
  • Fire / Hydraulic Services Compliance Checklist. ( Link to PDF)
  • Communications / MATV / Security Compliance Checklist ( Link to PDF)
  • Fire / Smoke Damper Inspection Schedule( Link to PDF)
  • Medical Gasses Compliance Checklist. ( Link to PDF)
  • Vertical Transportation Compliance Checklist. ( Link to PDF)

* Links under construction

MQ Default Commissioning Templates - Mechanical

  Click on titles to download relevant PDF File

Inspection and Test Plans

 

Methodologies

 

Test Reports

Water Cooled Chillers Pipework Flushing Flushing Test Report
Air Cooled Chillers Pipework Hydrostatic Pressure Test Chiller Test Report
Buffer Tanks Refrigerant Pipework Pressure Test Air Cooled Chiller Test Report
Cooling Towers Flood Test Condensate Drains Boiler Test Report
Pumps Cooling Tower Testing Cooling Tower Test Report
Pipe work AHU and FCU Testing Heat Exchanger Test Report
Pipe work Insulation Water Balancing Pump Test Report
Valves Duct Traverse Measuring Water balance Test Report
Water Cooled Package Units (WPAC) PAC Testing AHU and FCU Test Report
Fan Coil Units (FCU)   Air Balance Test Report
Variable Refrigerant Volume Systems (VRV)   Duct Air Flow Test Report
Boilers   Fan Test Report
HHW Coils   Packaged Unit Test Report
Fans   Variable Air Volume Test Report
Duct Work   Air Heat Exchanger Test Report
Duct Work Insulation    
Air Diffusion    
Variable Air Volume Boxes (VAV)    
Variable Speed Drive Units (VSD)    

MQ Default Commissioning Templates - BMCS

  Click on titles to download relevant PDF File

Inspection and Test Plans

 

Methodologies

 

Test Reports

Control Application Software Generic binary input Points calibration record test report
Graphic Interface Generic binary output Functional testing record - Individual systems
Installation of cable support system Generic analogue input Functional testing - Whole of building record
Installation of cable and wiring Generic analogue output  
Installation points checklist Differential pressure transducer  
Installation panel Pre-Commissioning checklist Differential pressue air switch  
Installation network communication checklist Differential pressure water switch  
Third party equipment integration C02 sensor  
  Duct mounted temperature and humidity sensor  
  Wall mounted temperature and humidity sensor  
  Immersion temperature sensor  
  Modulating valve and actuator  
  Two-position valve and actuator  
  Modulating damper and actuator  
  Two-position damper and actuator  
  Magnetic flow meter  
  Chiller High Level Input (HLI)  
  Generator High Level Input (HLI)  
  UPS High Level Input (HLI)  
  Smart energy meter  
  Water meter pulse type