Design Guidelines
Macquarie University Property

Dry Lab Preparation

Space description

The Dry Lab Preparation room is a supplementary support space to the Teaching Dry Laboratory.
Fixtures, tables, workbenches and cupboards are provided for the preparation of experiments and the storage, cleaning and preparation, cleaning of materials, apparatus and equipment.

Adjacencies

The Dry Preparation room should have access to and from the adjacent Teaching Laboratory(/ies).

[ Expand all ]

Components

Planning

Planning

Site factors -
Room and Spaces Planning Requirements Connected to adjacent Laboratory
Room to suite furniture layout 
May serve single or multiple labs.
Design occupancy <10
Area 30m2 for 1 Lab
50m2 for 2 Labs
Other Designed as a laboratory, to the Laboratory Code (PC-1)

More information about Planning

Building fabric

General

General -
Design principles -
Materials & finishes -
Proprietary items -

More information about building fabric General

Materials & Finishes

- -
- -
- -

More information about Materials & Finishes

Roof

- -
- -

More information about Roof

External Walls

- -
- -
- -

More information about External Walls

Internal Walls

Impact Resistance Standard Plasterboard Wall finish (painted Shoji White)
Fire Rating -
Wall Finish -
Other Splashback behind basin to 1200mm
Splashback above benches 450mm high (except where window are located)

More information about Internal Walls

Floors

General Selection Requirements -
Variations -
Preferred Material Selection -
Concrete -
Carpet -
Entry Floor Mats -
Floor Tiles -
Ceramic Tiles -
Resilient Floor Finishes Marmoleum (Anti-Static)
Other Coved Vinyl Skirting

More information about Floors

Underfloor Ventilation

- -
- -
- -

More information about Underfloor Ventilation

Ceilings

Ceiling Finishes -
Ceiling Heights -
Ceiling Selection -
Acoustic Ceilings Gridded acoustic tile ceiling Ecophon Acoustic in white
Non Combustible / Fire RatedNon combustible ceiling linings are required

More information about Ceilings

Openings

Windows

Window Selection Requirements External Windows are desireable for this space.
Sill height 1.2m.
Glazing -
Observation Windows Observation window to preparation, where possible, 900mm wide, from 1.2m to door Height(2.1m)
Visual Privacy -
Window Furniture -
Other -

More information about Windows

Doors

Doors Type

Solid core entry door with viewing panel.

Door Function Entry door lockable
Fire / Acoustic Rated -
Frame Type -
Glazing Half glazed entry door.
Glazed panels to Preparation room, 125mm wide by 600mm high with sill at 1200mm
Door Hardware Lock type
Classroom lock
Keying / locking
Keyed alike - Science Learning (Sc)
Master keying
Master keyed - Learning Spaces (LS)
Other
-
Natural LightingDaylightNatural daylight to room is desirable  
OtherAnti Glare blinds to external windows

More information about Doors

Fixtures

Fixtures

General Design Principles -
Amenities Fixtures -
Amenities for Mobility Impaired Persons -
Lecture Theatre Furniture & Fittings -
Cleaners Room & Store -
ConnectedCaroma Basin with Enware Taps.
OtherFume Cupboard

More information about Fixtures

Sanitary Fixtures

- -
- -

More information about Sanitary Fixtures

Furniture

Furniture

General Design Principles -
Recommended Furniture Selection -
Desk & Chair Selection KPD lab bench - chemical resist laminex (Oyster Grey)
Seating - Project specification

More information about Furniture

Fixed Furniture

Door Entry Mats -
Whiteboards Whiteboard Type 1
Pinboards -
Notice Boards -
Projection Screens -
Kitchen & Tea Room Equipment HWB only - Caroma + Enware tapware & Bottle trap
Lecterns -
Standard AVTS Digital Lecterns -
Fume Cupboards Yes
StorageSystem 7 underbench stage (Wedgewood Powdercoat)

More information about Fixed Furniture

Fittings

Fittings

General Design Principles -
Handrails & Balustrades -

More information about Fittings

Window Coverings

Blinds -
Curtains -
External Awnings -

More information about Window Coverings

Signage

Design Principles -
Macquarie University Signage and Wayfinding -
General"EYE PROTECTION REQUIRED" plus symbol.
"ENCLOSED FOOTWEAR REQUIRED" plus symbol.
"EMERGENCY STOP", above emergency stop near door.
Door SignageNumber Sequential within block Ie. "SCIENCE/ENGINEERING PREPARATION"

More information about Signage

Security

Security

Security type / group B
CCTV -
Access control -
Intruder detection -
Keying Refer to Doors

More information about Security

Acoustics

Acoustics

Noise level -
Noise emittance -
Room to room -
Room acoustics -

More information about Acoustics

Services

Ventilation

Natural ventilation -
Supply air -
Exhaust Provide local Exhaust when soldering undertaken.
Controls -
OtherAdditional exhaust as required for specific equipment

More information about Ventilation

Conditioning

Mechanical cooling Air Conditioning
Mechanical heating Provide Heating to MQU Standard
Controls -
Other Humidity - less than 60%
minimum value - project Specific

More information about Conditioning

Water

Portable cold water Required to hand basin, sink & Fume Cupboard (if installed) 
Portable hot / warm water Required to 1 x Sink basin
Non-portable water -
Other -

More information about Water

Drainage

Sanitary drainage Connection to one Handbasin at door. Include Bottle Trap
Connection to sink (1 off min) plus Fume Cupboard when installed.
Trade waste Trade waste connection to Sinks & Fume Cupboard.
All drainage pipework to be HDPE
Other -

More information about Drainage

Gas

N gas -
M gas -
Other 1 x Compressed air point, 1 x Natural Gas point,
others TBC in design
Gas may be used for heating, refer to Design Guide
Emergency Stop - To MQ standard.

More information about Gas

Fire protection

Fire detection Smoke detection & EWIS panel
Fire suppression FIRE HOSE REEL
As Required by Regulations
EWIS -
Portable fire equipment PORTABLE FIRE EXTINGUISHER / BLANKET
Located adjacent to Entry Door
Other -

More information about Fire protection

Illumination

Lighting / lux levels 240 lux
Lighting controls To MQU Standard
C-Bus Programmable switching
Other Recessed / Flush mounted  Sealed LED light fittings

More information about Illumination

Power

Type GPO Points to suit occupancy.
Min. 10A cuicuit
Dedicated cleaners circuit & circuit to fridge / freezer.
Max 10 outlets per circuit.
Laptop charging provisions
Quantity -
Other Include Emergency stop button to turn off power & gas, except for fridges/freezers.

More information about Power

Communication / AV

Voice COMMUNICATIONS/TELEPHONE POINTS
2 double data points required
Data -
AV type AV to MQU Standard, Type LAD
WAP Wireless Access point to all of room.
Data to lab benches
Other A/V OTHER
Connect to Uni Hub and TCH Hub and Uni Standard Phone

More information about Communication / AV

Vertical transport

Stairs -
Lifts / escalators -
Materials hoists / other -

More information about Vertical transport

Commissioning

Commissioning

Building Commissioning -
Services Commissioning -
As Built Documentation -

More information about Commissioning